Ultrasonic vibrating screen installation procedures and prec

date:2016-08-24 


UltraUltrasonic vibrating screen
Ultrasonic vibration sieve used for a long time, the screen will appear different degree of damage, the following for everyone to share how to install screen. Ultrasonic vibration sieve for net method is divided into two kinds: a kind is no guy tool quick net changing method, a kind of is using the tension and the network tool for network method.
1. ultrasonic vibration sieve without stretching tool for network method
1)The grid clean, to glue bonding surface with sandpaper roughen. Finally, the clean soft cloth dipped in acetone to bond the wiping surface.
2) Installation screen flat put on a clean surface, the grid on the screen net, pay attention to the direction of grid, the position of the transducer is arranged to;
3.)The beyond the screen rack from at the edge of the grid to rolled up and tighten, instantaneous dry glue (502) will roll up screen stick in the back of the grid, so that a flat screen tension in the grid;
4)The sealing rings are arranged on the 4 grid;
5) the rack arranged on the sieving machine, pressure on the frame, the locking bundle ring, tighten the ring beam nut and rubber hammer to tap evenly beam ring around the power distribution is uniform, with box to screen stencil compressing in the grid;
6) On the bonding surface uniform coating, coating at the same time with your fingers tightened on the screen, plastic evenly dispersed, wait for about 30 minutes in the gelatinize again until the glue completely dry can be used.
2, ultrasonic vibrating screen stretching tool for network method
1)clean the grid, with a clean soft cloth dipped in acetone to clean the adhesive surface;
2.)The tension and the network ring tile on the clean surface, to install the screen on the screen ring, locking clip, a flat screen tension in the tension and the network ring;
3)will be supported in a hanging rack;
4)KD-504A combo glue mixed fully, painted on the uniform grid;
5.)The tension and the network ring smooth put on a rack (Note: casualties of the tension ring downwards on the grid), the pressure will be block the smooth and uniform screws in the tension and the network around the ring, so that the surrounding stress is uniform, enable grid glue penetration on the top of the screen, until the glue completely dry through (in constant temperature environment, the need for solid dry 12 hours);
The first 6 block away after a screw will stretch locking clips online release, with the tension and the network ring, you can use.